About Well Drilling
At Chehalis Well Drilling LLC we use both Rotary and Cable Drill rigs, and use only the most state of the art drilling techniques We believe that our equipment knowledge and qualified personnel allows us to give our customers the best service possible.
Site Preparation
- The well site needs to be clearly marked with a stake marked "Well".
- The road and site pad need to able to withstand 60,000lbs. of equipment, in all weather conditions.
- There needs to be at least 15' of clearance with no overhead wires or tree limbs.
- The site pad must be wide enough for the drill rig and the support vehicle.
Well Drilling Links
web site by omOriginals Marketing!